(založena nová stránka s textem „First, you need to pull up the columns "Start 1 Tardiness Penalty", "Start 1 Tolerance", "End 1 Tardiness Penalty" and "End 1 Tolerance" in the Task at the unloading (or loading). The tolerance columns determine the width of the soft time window, and the penalty columns determine the penalty for using soft time windows.“) |
(Žádný rozdíl)
|
Aktuální verze z 15. 8. 2022, 09:28
First, you need to pull up the columns "Start 1 Tardiness Penalty", "Start 1 Tolerance", "End 1 Tardiness Penalty" and "End 1 Tolerance" in the Task at the unloading (or loading). The tolerance columns determine the width of the soft time window, and the penalty columns determine the penalty for using soft time windows.