Translations:TAS:Situace/Zakázky/Časová okna/Měkká časová okna/4/en
Verze z 15. 8. 2022, 09:28, kterou vytvořil Jana.safferova (diskuse | příspěvky) (založena nová stránka s textem „First, you need to pull up the columns "Start 1 Tardiness Penalty", "Start 1 Tolerance", "End 1 Tardiness Penalty" and "End 1 Tolerance" in the Task at the unloading (or loading). The tolerance columns determine the width of the soft time window, and the penalty columns determine the penalty for using soft time windows.“)
First, you need to pull up the columns "Start 1 Tardiness Penalty", "Start 1 Tolerance", "End 1 Tardiness Penalty" and "End 1 Tolerance" in the Task at the unloading (or loading). The tolerance columns determine the width of the soft time window, and the penalty columns determine the penalty for using soft time windows.