TAS:Situace/en: Porovnání verzí
		
		
		
		
		
		Skočit na navigaci
		Skočit na vyhledávání
		
				
		 
		
	
|  (Stránka aktualizována, aby odpovídala nové verzi zdrojové stránky) | |||
| Řádek 19: | Řádek 19: | ||
| ** with lines for the given days (if you have 3 cars in your fleet, the scenario will contain 21 lines) | ** with lines for the given days (if you have 3 cars in your fleet, the scenario will contain 21 lines) | ||
| Multiple solutions can be created within a single situation and can be edited and saved independently. If you change the data in a situation, the change will not be reflected back in the solutions already created. To do so, you must use the "[[TAS:Situace/Řešení/Přepočtení_řešení|Recalculate Solutions]]" function. | Multiple solutions can be created within a single situation and can be edited and saved independently. If you change the data in a situation, the change will not be reflected back in the solutions already created. To do so, you must use the "[[TAS:Situace/Řešení/Přepočtení_řešení/en|Recalculate Solutions]]" function. | ||
| * [https://wiki.solvertech.cz/wiki/TAS:Situace/Na%C4%8D%C3%ADt%C3%A1n%C3%AD_dat/en Data loading] | * [https://wiki.solvertech.cz/wiki/TAS:Situace/Na%C4%8D%C3%ADt%C3%A1n%C3%AD_dat/en Data loading] | ||
Aktuální verze z 25. 8. 2022, 12:44
Each situation (scenario) contains:
- list of orders - what is to be served
- a list of vehicles that can be used to serve the orders
- where the orders are to be delivered from and to and where the used vehicles are to arrive.
Scheduling methods (by time of shipment)
- daily scheduling
- the most common planning method
- the orders from the current day are used to create a delivery plan for the following day
 
- multi-day planning
- less common
- for example, on a weekly or monthly basis
- with lines for the given days (if you have 3 cars in your fleet, the scenario will contain 21 lines)
 
Multiple solutions can be created within a single situation and can be edited and saved independently. If you change the data in a situation, the change will not be reflected back in the solutions already created. To do so, you must use the "Recalculate Solutions" function.