Translations:TAS:Situace/Řešitel (F5 nebo F6)/Různé situace v řešiteli/Nakládací rampy/3/en

Z Solvertech
Verze z 10. 8. 2022, 07:15, kterou vytvořil Jana.safferova (diskuse | příspěvky) (založena nová stránka s textem „Jobs have both from and to stops in use. Both locations are not virtual. Precedence on both ends is 2 and higher. Jobs from duration is 0. The loading time in the depot is governed by the redispatch time on the vehicle. Add a dynamic column in the Locations, that allows the LoadingBaysCount field to be edited.“)
(rozdíl) ← Starší verze | zobrazit aktuální verzi (rozdíl) | Novější verze → (rozdíl)
Skočit na navigaci Skočit na vyhledávání

Jobs have both from and to stops in use. Both locations are not virtual. Precedence on both ends is 2 and higher.

Jobs from duration is 0. The loading time in the depot is governed by the redispatch time on the vehicle.

Add a dynamic column in the Locations, that allows the LoadingBaysCount field to be edited.