Translations:TAS:Situace/Řešitel (F5 nebo F6)/Různé situace v řešiteli/Nakládací rampy/3/en
Skočit na navigaci
Skočit na vyhledávání
Jobs have both from and to stops in use. Both locations are not virtual. Precedence on both ends is 2 and higher.
Jobs from duration is 0. The loading time in the depot is governed by the redispatch time on the vehicle.
Add a dynamic column in the Locations, that allows the LoadingBaysCount field to be edited.