- In the tab "Distribution locations" click on the option "List"
- A new window will open, where you will need to import the basic data structure, depending on what columns you want to create in the Distribution Database.
The data structure is best imported from Excel, or Notepad if you don't use Excel.
Create the necessary data structure. Example structure for columns (x, y, open, closed, unloading length, special marks)
id x y from to duration specialmarks default 0 0 7:00 18:00 10 ramp config stop2locationx stop2locationy stop2opentime stop2closetime stop2duration stop2specialcodes